The Brisbane Campus of Nazarene Theological College (NTC) in the Australia New Zealand Field (ANZ) is focused on preparing men and women for life and sustained ministry in an every-changing world, and has been doing just that for seventy years.
This project is designed to address some significant infrastructure needs on campus.
The current campus was built in the mid-1970s, with some updates in the 80s and 90s. There are several key sections that were never fully completed, including the main road entering the campus, the main parking lot, and dorm parking lot. The road base that was originally put down has now deteriorated significantly, and when we have heavy rains it creates dangerous holes that we need to quickly fill so no one is injured.
The cost breakdown for this project is:
Removing and disposing of top layer of existing base - $10,000
Laying new asphalt in main parking lot - $50,000
Making a new gravel road through campus - $20,000
Laying new asphalt in dorm parking lot and road - $50,000
Total Project Cost = $130,000
Will you support the work of NTC by helping to address these significant concerns?
In the US:
Make checks payable to General Treasurer and send them to:
Global Treasury Services
Church of the Nazarene
P.O. Box 843116
Kansas City, MO 64184-3116
In Canada:
Make Checks payable Church of the Nazarene Canada and send them to:
Church of the Nazarene Canada
3657 Ponytrail Drive
Mississauga, Ontario L4X 1W5.